RECONSTRUCTION OF APARTMENTS

AMSTERDAM, THE NETHERLANDS

Floor area: 292 sq.m.

Turnkey project, finished 2023

 

  • The apartment reconstruction project has been implemented according to the client’s wishes.
  • New walls built according to the new layout.
  • A bathroom installed and fitted with a new piping system.
  • Electrical installation renewed.
  • Interior finishing: plastering, daubing and painting of the walls.
  • Ceilings installed, maintaining the desired maximum ceiling height.
  • Tiling of the sanitary units carried out..
  • Interior doors installed and painted.
  • A modern lighting system installed.
  • Kitchen furniture fitted.

Full house renovation

HARLEM, THE NETHERLANDS

Floor area: 132 m2

Turnkey project, finished 2023

 

• Second floor construction works
• Construction of an extension
• Roof installation works
• Installation of new windows and doors
• Facade decoration
• Complete interior finishing works
• Electrical and plumbing installation
• Lighting system installation
• Plumbing works and bathroom decoration

FULL HOUSE RENOVATION

HARLEM, THE NETHERLANDS

Floor area: 125 sq.m.

Turnkey project, finished 2022

 

• Second floor construction works
• Construction of an extension
• Roof installation works
• Installation of new windows and doors
• Facade decoration
• Complete interior finishing works
• Electrical and plumbing installation
• Lighting system installation
• Plumbing works and bathroom decoration

Reconstruction of 36 apartments

BREDA, THE NETHERLANDS

Turnkey project, finished 2021

 

• Complete redesign of the premises
• Complete interior decoration: wall plastering and painting, ceiling installation, flooring
• Roof repair
• Installation of new doors
• Installation of a new electrical network
• Installation of new plumbing and ventilation systems
• Installation of a new heating system
• Installation of a modern lighting system
• Installation of the kitchen set

FULL APARTMENT RENOVATION

AMSTERDAM, THE NETHERLANDS

Floor area: 130 sq.m.

Turnkey project, finished 2022

 

• Installation of new doors
• Renovation of windows
• Installation of a new heating and ventilation system
• Installation of electrical and plumbing systems
• Complete interior finishing works
• Lighting system installation
• Bathroom finishing works
• Furniture installation

Reconstruction of 28 apartments

ROTTERDAM, THE NETHERLANDS

Turnkey project, finished 2023

 

• Complete redesign of the premises
• Installation of new windows and doors.
• Full interior decoration: wall plastering and painting, ceiling installation, flooring
• Installation of a new electrical system
• Installation of new plumbing and ventilation systems
• Installation of a new heating system
• Installation of a modern lighting system
• Installation of kitchen set

RECONSTRUCTION OF APARTMENTS

AMSTERDAM, THE NETHERLANDS.

Floor area: 160 sq.m.

Duration of the work: 5 months.

  • The floor area of the outdoor terrace connected to the living room has been enlarged.
  • Aluminium profile windows installed.
  • Additional walls built according to the new layout.
  • Bathrooms installed and fitted with a new piping system.
  • Electrical installation renewed.
  • Interior finishing: plastering, daubing and painting of the walls.
  • Plasterboard ceilings installed.
  • Tiling of the sanitary units carried out.
  • Interior doors installed and painted.
  • A modern lighting system installed.
  • Kitchen furniture fitted.

4 Vilas IN CORFU, GREECE

Finished 2021 September.

2650 m2

  • Full interior finishing
  • Windows and doors instaliation
  • New electricity network implementation
  • New plumbing and ventiliation system instaliation
  • New heating system instaliation
  • Moderns lightening system installation
  • Kitchen set instaliation
  • Swiming pool construction works

Full apartment renovation IN AMSTERDAM, NETHERLANDS

Turnkey project – finished 2022

96 m2

  • New doors installation
  • Windows renovation
  • New heating and ventilation system installation
  • New electric and plumbing installation
  • Full interior finishing works
  • Lightening system installation
  • Bathroom finishing and installation works

Full house renovation IN BREDA, NETHERLANDS

Turnkey project – finished 2021

260 m2

  • Second floor construction works
  • Construction of the extension
  • Roof construction works
  • New windows and doors instaliation
  • External facade works
  • Full interior finishing works
  • New electric and plumbing installiation
  • Lightening system installation
  • Plumbing works and bathroom finishing

CONTRUCTION OF INDIVIDUAL HOUSES

LITHUANIA, PALANGA

Duration of the work: 5 months.

  • Walls (installation of partitions)
  • Floor concrete installation
  • Roof installation
  • Facade installation (ventilated with tiles and wood planks)
  • Complex interior finishing services

``Continental`` factory

IN KAUNAS, LITHUANIA

2500 m2 – finished 2021

  • Interior finishing: plastering and painting walls, rubber ceiling
  • installation, flooring
  • Installation walls decorations
  • New electricity network implementationn
  • Lightening system installation
  • Plumbing works

Renovation and installation of 16 apartments

IN PALANGA, LITHUANIA

Turnkey project – finsished 2024

550 m2

  • Complete redesign of the premises
  • Full interior finishing: plastering and painting walls, ceiling
  • installation, flooring.
  • New windows and doors installiation
  • Walls decoration.
  • New electricity network implementation
  • Moderns lightening system installation
  • Kitchen set assembling

SPA area in HOTEL GABIJA

IN Palanga, LITHUANIA

Finished 2022.

  • Full interior finishing.
  • Mosaic tyling in swiming area spa zones
  • Installation of wooden ceilings decoration
  • Installation of glass partitions
  • Electricity network implementation
  • Plumbing and ventiliation system instaliation
  • Heating system instaliation
  • Moderns lightening system installation

Finishing and installation of 5 apartments IN Vilnius, LITHUANIA

Turnkey project – finsished 2022

240 m2

  • Full interior finishing: plastering and painting walls, ceiling
  • installation, flooring.
  • Doors installiation
  • Walls decoration.
  • Natural floors instaliation.
  • New electricity network implementation
  • Moderns lightening system installation
  • Kitchen set assembling.

Construction of individual house IN Klaipeda, LITHUANIA

Turnkey project – finished 2022.

  • Installation of the foundation
  • Structural works of wooden frame
  • Roof covering and exterior facade installation
  • Installing all new windows and doors
  • Installation of stairs
  • Electricity network implementation
  • Plumbing and ventilation, heating  system installation
  • Moderns lightening system installation
  • Kitchen set installation
  • Installation of outdoor terraces

Construction of individual house IN Klaipeda, LITHUANIA

Turnkey project – finished 2022.

  • Installation of the foundation, structural works of wooden frame
  • Roof covering and exterior facade installation
  • Installing all new windows and doors
  • Installation of stairs
  • Installation of wooden ceilings decoration & glass partitions
  • Electricity network implementation
  • Plumbing and ventilation, heating system installation
  • Moderns lightening system installation
  • Kitchen set installation
  • Installation of outdoor terraces & jacuzzi

Renovation of apartment

KLAIPĖDA, LITHUANIA

Floor area: 150 sq.m.

Turnkey project, finished 2024

 

• Replanning of premises
• Full interior finishing
• Installation of stairs
• Wall decoration
• Installation of a new electrical network
• Installation of a modern lighting system
• Production and assembly of cabinet furniture

Interior finishing of individual house

KLAIPĖDA, LITHUANIA

Floor area: 240 sq.m.

Turnkey project, finished 2024

 

• Full interior decoration
• Installation of a new electricity network
• Installation of a modern lighting system
• Production and assembly of cabinet furniture