RECONSTRUCTION OF APARTMENTS

4 VILAS IN CORFU, GREECE
June 4, 2024
INTERIOR FINISHING OF APARTMENT
June 4, 2024

AMSTERDAM, THE NETHERLANDS.

Floor area: 160 sq.m.

Duration of the work: 5 months.

  • The floor area of the outdoor terrace connected to the living room has been enlarged.
  • Aluminium profile windows installed.
  • Additional walls built according to the new layout.
  • Bathrooms installed and fitted with a new piping system.
  • Electrical installation renewed.
  • Interior finishing: plastering, daubing and painting of the walls.
  • Plasterboard ceilings installed.
  • Tiling of the sanitary units carried out.
  • Interior doors installed and painted.
  • A modern lighting system installed.
  • Kitchen furniture fitted.