AMSTERDAM, THE NETHERLANDS.
Floor area: 160 sq.m.
Duration of the work: 5 months.
- The floor area of the outdoor terrace connected to the living room has been enlarged.
- Aluminium profile windows installed.
- Additional walls built according to the new layout.
- Bathrooms installed and fitted with a new piping system.
- Electrical installation renewed.
- Interior finishing: plastering, daubing and painting of the walls.
- Plasterboard ceilings installed.
- Tiling of the sanitary units carried out.
- Interior doors installed and painted.
- A modern lighting system installed.
- Kitchen furniture fitted.