INTERIOR FINISHING OF INDIVIDUAL HOUSE
June 4, 2024LITHUANIA
Floor area: 70 sq.m.
Duration of the work: 2 months.
- The loft installation project was implemented based on the client’s wishes.
- Insulation of ceilings and walls.
- Interior walls.
- Additional walls built according to the new layout.
- Electrical installation carried out.
- Interior finishing work: plastering, daubing and painting of the walls.
- Tiling of the sanitary units.
- Installation and painting of interior doors.
- Furniture design and installation.