LOFT INSTALLATION

INTERIOR FINISHING OF INDIVIDUAL HOUSE
June 4, 2024

LITHUANIA

Floor area: 70 sq.m.

Duration of the work: 2 months.

 

  • The loft installation project was implemented based on the client’s wishes.
  • Insulation of ceilings and walls.
  • Interior walls.
  • Additional walls built according to the new layout.
  • Electrical installation carried out.
  • Interior finishing work: plastering, daubing and painting of the walls.
  • Tiling of the sanitary units.
  • Installation and painting of interior doors.
  • Furniture design and installation.